• SWE
  • FIN
  • EST
  • ENG
  • Who we are
  • Products
    • Modular BIO boiler plants 150 kW-5 MW
      • IndustriCont 999 kW – 5 MW
      • PowerCont 150-999 kW
      • PelletCont 150-999 kW
    • Stationary BIO boiler rooms 150 kW – 10 MW
    • Equipment
      • Burner BM series 999 kW — 6 MW
      • Boiler Power series 150-1500 kW
      • Vertical heat exchanger, OG series 999 kW — 6 MW
      • Fuel Storage
      • Conveyors / Feeders
      • Flue gas cleaning
      • Ash removal system
      • Chimneys
      • Automation and control system
  • Services
    • Design of boiler systems, construction, and installation of equipment
    • Installation works and maintenance
    • Production of metal constructions
    • Training and consultations
  • Completed projects
    • SWEDEN
    • FINLAND
    • ESTONIA
    • NORWAY
    • RUSSIA
  • CERTIFICATES
  • Contact
  • TOETUSED
  • enENG
    • etEST
    • fiFIN
    • svSWE
  • Who we are
  • Products
    • Modular BIO boiler plants 150 kW-5 MW
      • IndustriCont 999 kW – 5 MW
      • PowerCont 150-999 kW
      • PelletCont 150-999 kW
    • Stationary BIO boiler rooms 150 kW – 10 MW
    • Equipment
      • Burner BM series 999 kW — 6 MW
      • Boiler Power series 150-1500 kW
      • Vertical heat exchanger, OG series 999 kW — 6 MW
      • Fuel Storage
      • Conveyors / Feeders
      • Flue gas cleaning
      • Ash removal system
      • Chimneys
      • Automation and control system
  • Services
    • Design of boiler systems, construction, and installation of equipment
    • Installation works and maintenance
    • Production of metal constructions
    • Training and consultations
  • Completed projects
    • SWEDEN
    • FINLAND
    • ESTONIA
    • NORWAY
    • RUSSIA
  • CERTIFICATES
  • Contact
  • TOETUSED
  • enENG
    • etEST
    • fiFIN
    • svSWE

PowerCont_est

  • One more delivery!
  • Project Taattu 350 kW on site!
  • Bio Mobitek and Adven Eesti signed a contract
  • Elmia Exhibition in Sweden
  • 05/08/2016 Project ETA Norra has gone to the customer
  • 09/May/2016. Exhibition in Sweden Emmaboda Flygbanna 13-14th of May 2016
  • 19.04.2016. Measurements of emissions 3 mW modular system. Project Laihia, Finland
  • 01.02.2016 Martin project. Modular PowerCont boiler room 250 kW commissioned.
  • 26.02.2016 Sweden Backgarden 999 kw. Open day.
  • In January 2015 we will launch 3 MW biofuel boiler plant in Laihia, Finland
  • EU Certification issued certificate of Conformity EE101509581 to Bio Mobitek OÜ.
  • a 3 MW biofuel container boiler was installed in Kauhava municipality (Finland)

BM_PowerCont_A4_EST.compressed

BM_PowerCont_A4_EST.compressed


©2016 Biomobitek