Bio Mobitek

Panncentraler för biobränsle på 150 kW - 10 MW
från Bio Mobitek

Läs mer

Project Taattu 350 kW on site!

Our next project left our facility and went to the happy customer. Project name – Taattu Product – PowerCont – boiler in ”turn key” module  Boiler – BMT Power 350 kW Fuel storage – build in, 64 m3, wood chip Customer – chicken farm Another happy customer  😀  

Bio Mobitek and Adven Eesti signed a contract

Bio Mobitek and Adven Eesti signed a contract for the supply of boilers with a total capacity of 2 MW in the village of Loo, Estonia. This is the first contract for Bio Mobitek company in Estonia market. Сongratulations!

Elmia Exhibition in Sweden

Meet Bio Mobitek on Elmia 2015 this Friday/Saturday with Hjo Varmeteknik. Come on and buy your heat 🙂  

09/May/2016. Exhibition in Sweden Emmaboda Flygbanna 13-14th of May 2016

Bio Mobitek and HJO Varmeteknik taking a part in Emmaboga exhibition on 13-14th of may 2016. We going to present our module bioboiler systems. You can find us on place #97. Come and have fun with us!!!!

19.04.2016. Measurements of emissions 3 mW modular system. Project Laihia, Finland

19.04.2016 made measurements of emissions Modular Bio System Laihia, Finland. Year of installation – 2014. Power – 3,2 MW Fuel – wood chip Fuel moisture – 48% Emissions – O2 – 6.4% CO – 6 ppm COx – 9 ppm Efficiency – 97,4 %  

01.02.2016 Martin project. Modular PowerCont boiler room 250 kW commissioned.

PowerCont boiler room 250 kW commissioned. Martin 250 project. This project has been completed together with our partner from Sweden — Hjo Varmeteknik www.hjovarmeteknik.se    

26.02.2016 Sweden Backgarden 999 kw. Open day.

On 26.02.2016 at 10 A.M. (local time) open day will take place at one of our completed sites in Sweden – Backgarden 999 kw. This project has been completed together with our partner in Sweden — Hjo Varmeteknik www.hjovarmeteknik.se Short technical discription Project:           Backgarden –Sweden – 1 Mw module + storage Loe lähemalt

In January 2015 we will launch 3 MW biofuel boiler plant in Laihia, Finland

Complete solution consists of 3 MW container boiler plant. Main fuels include milled peat and wood chips

a 3 MW biofuel container boiler was installed in Kauhava municipality (Finland)

The complex includes a 3 MW biofuel boiler and storage of biofuels Keith Walking Floor, including fuel supply and conveyor. The fuel used are wood chips and milled peat.